Singuda ENSIKOM Vol 6 No.1 Januari 2014
Table of Contents
Articles
PERBANDINGAN KILOWATTHOUR METER ANALOG DENGAN KILOWATTHOUR METER DIGITAL ( Aplikasi Pada PT. PLN (Persero) Cabang Medan) | |
juri saputra sebayang, masykur sj | 7-12 |
STUDI PENGATURAN KECEPATAN MOTOR DC SHUNT DENGAN METODE WARD LEONARD | |
Dimas Harind Yudha Putra, Riswan Dinzi | 13-18 |
STUDI PERANCANGAN SALURAN PENCATU UNTUK ANTENA MIKROSTRIP ARRAY ELEMEN 2X2 DENGAN PENCATUAN APERTURE COUPLED | |
Pindo Ahmad Alfadil, Ali Hanafiah Rambe | 19-24 |
STUDI PERANCANGAN JARINGAN AKSES FIBER TO THE HOME (FTTH) DENGAN MENGGUNAKAN TEKNOLOGI GIGABIT PASSIVE OPTICAL NETWORK (GPON) DI PERUMAHAN CBD POLONIA MEDAN | |
ISMAIL FARUQI, SIHAR P PANJAITAN | 25-29 |
STUDI PERBANDINGAN PARAMETER-PARAMETER PRIMER ANTENA MIKROSTRIP | |
Franklin Torangma Sianturi, Ali Hanafiah Rambe | 30-35 |
ANALISA ANTENA DIPOLE LAMBDA/2 PADA MODUL PRAKTIKUM B4520 MENGGUNAKAN SIMULATOR ANSOFT HFSS VERSI 10.0 DAN CST MICROWAVE STUDIO 2010 | |
Muhammad Rumi Ramadhan, Arman Sani | 36-41 |
STUDI PERBAIKAN TORSI DAN EFISIENSI MOTOR INDUKSI TIGA FASA DENGAN MEMPERBAIKI FAKTOR DAYA MOTOR INDUKSI | |
Muhammad Fahmi Syawali Rizki, A. Rachman Hasibuan | 42-47 |
ANALISIS KINERJA JARINGAN SWITCHING BATCHER-BANYAN | |
Chairunnisa FR Tanjung, Muhammad Zulfin | 48-53 |
ISSN 2337-3237
Copyright ©2019 Departemen Teknik Elektro FT USU. All rigths reserved